Good to know

The questions homeowners ask us

Not covered here? Call and ask; Clackamas Well Drilling answers the awkward questions too.

How long does a new well take to drill?

Drilling time depends on depth and soil conditions, typically one to three days on site. Permitting and water testing add one to two weeks to the full project.

What does a well drilling project cost?

Cost factors include depth, soil type, permit fees, and well casing material. We provide a detailed estimate after a site inspection.

Do I need a permit to drill a well?

Yes — Oregon requires a well constructor's license and state approval before drilling. We handle permitting and compliance as part of the job.

How do I know if my property can have a well?

We assess your land for depth, soil stability, and groundwater availability at no cost. Oregon also requires minimum distances from septic systems and property lines.

Will my well provide enough water year-round?

We test water flow and quality after drilling to ensure year-round supply. Well depth and aquifer conditions determine flow rate and reliability.

What happens after the well is drilled?

We install the casing, set the pump, run water lines to your home, and test quality and flow. A licensed inspector signs off before you take over.

What are signs my well pump is failing?

Low water pressure, spurting, total loss of flow, or a pump that won't start are common warnings. Repair or replacement depends on age and type of damage.

How quickly can you repair a pump?

We dispatch same-day for emergency calls. Repair time ranges from one to three hours depending on the problem and pump location.

Is repair or replacement cheaper?

Repair is less expensive short-term, but a pump over ten years old may fail again soon. We'll diagnose the issue and recommend the cost-effective path.

What type of pump do I need?

Submersible pumps are most common for residential wells; above-ground pumps suit shallow wells or special layouts. We recommend the best fit based on your well depth and water demand.

How long does pump installation take?

A standard pump installation takes four to six hours. More complex setups or system upgrades may take longer.

Will the new pump need maintenance?

New pumps are reliable but benefit from an annual inspection. We can set up service visits to check pressure tanks, seals, and electrical connections.

Can you drill a high-volume well for my farm or business?

Yes — we design and install wells for agricultural and commercial water demands. We work with you on flow requirements, pressure systems, and redundancy.

How is a commercial well different from a home well?

Commercial wells are deeper, often with larger-diameter casing to handle higher flow rates. System design includes pressure regulation, storage tanks, and backup capacity.

What's the timeline for a commercial project?

Permitting and engineering take two to four weeks; drilling and installation take one to two weeks depending on depth and complexity.

Local well and pump work you can count on.

New wells, pump repairs, and water system service. Licensed, insured, and ready today.